TERMOELEKTRARNA TRBOVLJE d.o.o.
- Reconstruction of the control devices and its SW part of the coal transport section in thermo power plant
- Reconstruction of the R1C electrical cabinet in the engine block 125MW
- Moving the electrical part of Č3 water supply section into the container of water supply system - revamping of electrical cabinets for Č3 water supply system
- Equipment repair for the status display of the 6kV switchyard on filling station (depo) Lakonca
- The energy supply and fire reporting branch reform
- Equipment upgrade for automatic pumps operation for drainage and the elimination of the environmental problems on fuel oil pumping station
- Installation of optical cables on the coal transport (the bottom of the over dig section)
- Reconstruction of electric equipment of the Bridge cranes
- Equipment changes for visualization of the stacker – reclaimer
- Cathode protection of pipelines, construction of potable water supply and integration of the control system
- Measurement and regulating the quantity of fuel in the plants fuel pumping section
- The establishment of the fire reporting system
OBČINA ZAGORJE
- Solar power plant installed on the roof of the Municipal Cultural center in Zagorje
- Hybrid supply system for OLEA research unit
IG Energetski sistemi d.o.o. Kromberk
- PV power plant on the roof of IG Energetski sistemi d.o.o. Kromberk
ETI d.d.Izlake
ACRONI d.o.o.
- automation of the crane operation
ISKRA ZAŠČITE d.o.o.
F.LEITNER Mineraloele Graz, Austria
- upgrade of the aditive system for fuels-BioD
LAFARGE CEMENT d.o.o. Trbovlje
- Electrification of the cooling system for technological water supply
- Reconstruction of the part of production information system
- Design of the transport control for alternative fuels (used tires)
- Elimination of interference in the section of cement transport operation (at the transportation of raw materials for cement production)
- Replacing control cabinets (for transport of raw material)
- Integration into the Beumer palletizers
- Implementation the grate drives on the clinker cooler
- Supply and connection of the equipment for the control of the electro filter at the cement mill
- The lift and drop control of the fence at the loading station
- Inclusion of the libra into the coal dosing control system
- Regulation and control of kiln (for cement)
- Reconstruction of the cement mill- and its integration into the system
- Control of cement mill auxiliary drives
- Installation of control equipment to the cement silo blower
- Design the control equipment to reduce nitrogen oxides
HOLCIM SRBIJA
- Permanent magnetic separator from Wagner Magnete
TERMOELEKTRARNA TOPLARNA Ljubljana d.o.o.
- Magnetic separator for the above installation on the transport system ( conveyor belt for coal transport)
- Switchgear replacement for the electrical filter of Boiler 3
- Automated mixing system for mixing watering the coal ash
LUKA KOPER d.d.
- Revamping of STS bridge cranes
- Revamping of RTG cranes on container terminal
- Replacing the cable drums on the port cranes
- Additive adding into the bio Diesel
- Inclusion of additional filling stations at the oil loading terminal
- Measurement of the alumina transshipment at the terminal
- Cable drum with a longer power cord and the bridge crane
SKB d.d. and PCA d.o.o.
- Replacement of the stable fire-extinguishers- system and installation of new Argonite Fire protection system
- Maintenance of new fire protection system
KIDDE OXON, GBR
- Service works on Argonite system on the local area
LITOSTROJ Ulitki d.o.o. Ljubljana
LITOSTROJ Jeklo d.o.o. Ljubljana
- Revamping of two bridge cranes 80T/20T and on 60T/20T
- The repair of the overloading facility
VITALES d.o.o. Nova Bila
- Technological line for production of wood pellets, with an annual capacity of 40,000 tons
RZVZ
- Maintenance and service works on inclinometric equipment, which monitor ground movement (coal mining area)