TERMOELEKTRARNA TRBOVLJE d.o.o.

  • Reconstruction of the control devices and its SW part of the coal transport section in thermo power plant
  • Reconstruction of the R1C electrical cabinet in the engine block 125MW
  • Moving the electrical part of Č3 water supply section into the container of water supply system - revamping of electrical cabinets for Č3 water supply system
  • Equipment repair for the status display of the 6kV switchyard on filling station (depo) Lakonca
  • The energy supply and fire reporting branch reform
  • Equipment upgrade for automatic pumps operation for drainage and the elimination of the environmental problems on fuel oil pumping station
  • Installation of optical cables on the coal transport (the bottom of the over dig section)
  • Reconstruction of electric equipment of the Bridge cranes
  • Equipment changes for visualization of the stacker – reclaimer
  • Cathode protection of pipelines, construction of potable water supply and integration of the control system
  • Measurement and regulating the quantity of fuel in the plants fuel pumping section
  • The establishment of the fire reporting system

OBČINA ZAGORJE

  • Solar power plant installed on the roof of the Municipal Cultural center in Zagorje
  • Hybrid supply system for OLEA research unit

IG Energetski sistemi d.o.o. Kromberk

  • PV power plant on the roof of IG Energetski sistemi d.o.o. Kromberk

ETI d.d.Izlake

  • PV DC and AC el.cabinets

ACRONI d.o.o.

  • automation of the crane operation

ISKRA ZAŠČITE d.o.o.

  • PV power plant of 300kW

F.LEITNER Mineraloele Graz, Austria

  • upgrade of the aditive system for fuels-BioD

LAFARGE CEMENT d.o.o. Trbovlje

  • Electrification of the cooling system for technological water supply
  • Reconstruction of the part of production information system
  • Design of the transport control for alternative fuels (used tires)
  • Elimination of interference in the section of cement transport operation (at the transportation of raw materials for cement production)
  • Replacing control cabinets (for transport of raw material)
  • Integration into the Beumer palletizers
  • Implementation the grate drives on the clinker cooler
  • Supply and connection of the equipment for the control of the electro filter at the cement mill
  • The lift and drop control of the fence at the loading station
  • Inclusion of the libra into the coal dosing control system
  • Regulation and control of kiln (for cement)
  • Reconstruction of the cement mill- and its integration into the system
  • Control of cement mill auxiliary drives
  • Installation of control equipment to the cement silo blower
  • Design the control equipment to reduce nitrogen oxides

HOLCIM SRBIJA

  • Permanent magnetic separator from Wagner Magnete

TERMOELEKTRARNA TOPLARNA Ljubljana d.o.o.

  • Magnetic separator for the above installation on the transport system ( conveyor belt for coal transport)
  • Switchgear replacement for the electrical filter of Boiler 3
  • Automated mixing system for mixing watering the coal ash

LUKA KOPER d.d.

  • Revamping of STS bridge cranes
  • Revamping of RTG cranes on container terminal
  • Replacing the cable drums on the port cranes
  • Additive adding into the bio Diesel
  • Inclusion of additional filling stations at the oil loading terminal
  • Measurement of the alumina transshipment at the terminal
  • Cable drum with a longer power cord and the bridge crane

SKB d.d. and PCA d.o.o.

  • Replacement of the stable fire-extinguishers- system and installation of new Argonite Fire protection system
  • Maintenance of new fire protection system

KIDDE OXON, GBR

  • Service works on Argonite system on the local area

LITOSTROJ Ulitki d.o.o. Ljubljana

LITOSTROJ Jeklo d.o.o. Ljubljana

  • Revamping of two bridge cranes 80T/20T and on 60T/20T
  • The repair of the overloading facility

VITALES d.o.o. Nova Bila

  • Technological line for production of wood pellets, with an annual capacity of 40,000 tons

RZVZ

  • Maintenance and service works on inclinometric equipment, which monitor ground movement (coal mining area)